KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  4-16-2010
Number of Hours:  1.00
Manual Reference:  Page 6-4
Brief Description:  Work is halted on the HS until inspection

There is not a whole lot more I can do until after the I have an inspection from an MDRA inspector, which wont be for some time.

I removed the rest of the vinyl off and tried to polish the skins abit. Over all, I'm pretty satisfied with the work so far. I will be removing the AN3 bolts and replace them with AN3 drilled bolts so that I can install cotter pins.

It's a requirement in Canada for all bolts that can rotate, be safetied with a cotter pin.
' style=

The flush rivets

The flush rivets

' style=




' style=

Going to be put away in storage

Going to be put away in storage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.